Rainfall and wash-area diversion

First Flush Diversion Systems

Keep clean stormwater separate while capturing the initial runoff from contaminated wash bays and hardstands. Trade Wash helps define the operating sequence, storage and downstream treatment pathway for the project.

Capture first-flush runoff

Keep cleaner stormwater separate

Configured for exposed wash areas

For open wash bays, hardstands and exposed industrial catchments

Wash water and runoff

What happens when it rains?

A reliable layout clearly separates wash mode, first-flush capture and clean-rain bypass conditions.

01

Dry period

The exposed surface accumulates sediment and operational residues.

02

First rainfall

Initial runoff is directed to the nominated storage or treatment route.

03

Volume reached

The system changes state after the design capture condition is met.

04

Clean runoff

Later rainfall follows the approved clean-stormwater pathway where permitted.

Information needed

First flush sizing and layout inputs

These details let us size the equipment and identify questions that should be resolved before pricing or construction.

  • Exposed catchment area and surface falls
  • Local rainfall design criteria
  • Available pit, tank and plant space
  • Likely pollutants and solids loading
  • Wash-mode drainage arrangement
  • Downstream treatment, reuse or disposal destination

Compare options

First flush or demand-driven diversion?

First flush responds to rainfall across an exposed catchment. Demand-driven systems switch pathways around active washdown. Some sites need one; complex sites may need both functions coordinated.

ApproachBest fitDeliveryCommitment
First flushRainfall on exposed surfacesRain event and capture volumeUnroofed bays
Demand drivenActive vehicle washdownWash operation or controlsRegular wash areas
Combined strategyMixed rainfall and wash modesProject control sequenceComplex sites

How we scope and quote

From site details to a quoted wash bay setup

  1. Send the job detailsVehicles, wash activity, location, photos and water destination.
  2. We check the wash area and water pathContainment, collection, treatment and routing are reviewed together.
  3. We price the right equipmentEquipment, options, exclusions and the next information required.

Questions we are regularly asked

Before you request pricing

Final suitability and regulatory requirements remain specific to the site, water authority and proposed discharge or reuse pathway.

What does first flush mean?

It is the initial runoff from a rain event, which can carry a higher concentration of pollutants accumulated on an exposed surface.

How much water must be captured?

The design volume depends on catchment area, rainfall criteria, site conditions and authority requirements. It should not be selected from tank size alone.

Does first flush treat the water?

No. Diversion controls where water goes. Captured water may still require settling, oil separation, filtration, reuse treatment or approved disposal.

Can the system be retrofitted?

Often yes, but existing levels, drainage access, available storage and the clean-stormwater connection need to be surveyed first.

Discuss your wash bay requirements

Confirm the right wash bay setup

Send the vehicle type, site location and where the wash water needs to go. We’ll confirm the information needed to quote the right setup.

  • Vehicle and site suitability checked before quoting
  • Containment, diversion and treatment considered together
  • Australia-wide supply and support